86exporter.com Home       Products Catalog      Suppliers Catalog      Log In        Sign up
      About Us
      Profile
      Products
      Contact Us


the north mining plant

Products >> grouting material

grouting material

Build Your Online Product Catalogs?



Description
Product Name: grouting material
Supply Ability:
Related proudcts grouting material, grouting material, grouting material,
Specifications complete
Price Term: Factory-gate prices
Port of loading:
Minimum Order 1ton
Unit Price: RMB1150yuan/ton

A, product introduction

Non-shrink grouting material is made of high strength and optimize the gradation to cement material as the aggregate as binder, supplemented by preventing settlement, prevent the segregation, high flow pattern, micro expansion, enhance substances such as configuration and into. This KX series non-shrink self-leveling grouting material is it self-leveling, avoid vibration, high strength, micro expansion and contraction resistance, resistance to penetration, wear resistance, ageing resistance characteristics and many kinds of use function, convenient operation, wide application.
Second, applicable scope:
1, steel framework based, juncture filling grouting. 2, mechanical equipment anchor bolt, anchor base of fixed grouting. 3, bridge base, supporting mat concrete surface layer, batholith grouting. 4, continuous wall, inverse dozen wall columns, basement wallboard, after playing seismic resistance wall. 5, steel plant, power plant, the fast repair grouting etc machinery factory. 6, bridge, the expansion joints, road, airport runway rapid maintenance repair. 7, rail board, prefabricated cement products missing Angle and fracture repair.

Three, the product features
¡ø early strength high strength after 1-3 days pour strength up to 30*** above, shorten the construction period.
¡ø artesian water mix, modal site only directly into the equipment foundation, mortar gravity flow, construction, ensure no vibration free vibration, long grouting construction.
¡ø micro expansion casting body use for a long time without shrinkage, to ensure that equipment and foundation, foundation and foundation close contact between non-shrink, and proper inflation compressive stress ensure equipment long-term safety operation.
¡ø of oil and permeability in oil soak 30 days after its strength increased by more than 10 percent, molding body, close-grained, anti-permeability, adapt to the base oil pollution and environmental protection.
¡ø durability 200 million times fatigue test, 50 times freeze-thaw environ

Contact Us
Company: the north mining plant
Contact: Ms. zhang lijuan
Address: worker-peasant road618hao
Postcode:
Tel: 0311-85330543
Fax: 0311-85330543
E-mail:         


Copyright© the north mining plant All Rights Reserved.
Tel : 0311-85330543 Fax : 0311-85330543
Powered by 86exporter.com